loader image
Close
  • Company
    • Company Profile
    • Certifications
    • Our Story
    • SABO GROUP
  • Our Operations
    • Infrastructure Projects
    • Port Projects
    • Road Construction
    • Hydraulic Works
    • Industrial projects
    • Environmental Projects - Energy
    • Building Projects
    • Asphalt Mixture Production & Sale
    • Comprehensive Project Management
  • Equipment
  • Careers
  • News
  • Contact us

EN
EN EL
Contact Us
  • Company
    • Company Profile
    • Certifications
    • Our Story
    • SABO GROUP
  • Our Operations

      Infrastructure Projects

      Port Projects
      Road Construction
      Hydraulic Works

      Environmental Projects

      Industrial projects

      Asphalt Mixture Production & Sale

      Comprehensive Project Management

    • Infrastructure Projects
    • Port Projects
    • Road Construction
    • Hydraulic Works
    • Industrial projects
    • Environmental Projects - Energy
    • Building Projects
    • Asphalt Mixture Production & Sale
    • Comprehensive Project Management
  • Equipment
  • Careers
  • News
  • Contact us

  • Company
    • Company Profile
    • Certifications
    • Our Story
    • SABO GROUP
  • Our Operations

      Infrastructure Projects

      Port Projects
      Road Construction
      Hydraulic Works

      Environmental Projects

      Industrial projects

      Asphalt Mixture Production & Sale

      Comprehensive Project Management

    • Infrastructure Projects
    • Port Projects
    • Road Construction
    • Hydraulic Works
    • Industrial projects
    • Environmental Projects - Energy
    • Building Projects
    • Asphalt Mixture Production & Sale
    • Comprehensive Project Management
  • Equipment
  • Careers
  • News
  • Contact us

EN
EN EL
sicap color
EN
EN EL
Contact Us
Our News

Completion of Coastal Protection Port Project in Platamonas, Pieria

By Irene Vasileiou 

Completion of Coastal Protection Port Project in Platamonas, Pieria

A major coastal protection project in Platamonas, Pieria (Municipality of Dion–Olympus) has been successfully completed, addressing ongoing shoreline erosion and strengthening the resilience of the coastal zone.

The works included:

  • Construction of 7 submerged breakwaters
  • Beach nourishment along a 1,150 m. stretch
  • Reinforcement of 4 existing breakwaters with a crest elevation increase of 0.8 m.
  • Extension of the two terminal groynes (left and right) by 25 m.

The project, with a total budget of €3.5M, was carried out under particularly demanding conditions, with strong wave action and adverse weather, requiring a high level of technical expertise and effective coordination.
Its implementation contributed significantly to the stabilization of the coastline, the protection of critical infrastructure, and the enhancement of the area’s tourism activity.

PLATAMONAS-06-2026_01
PLATAMONAS-06-2026_02
PLATAMONAS-06-2026_04
PLATAMONAS-06-2026_05
PLATAMONAS-06-2026_06
PLATAMONAS-06-2026_07
PLATAMONAS-06-2026_08


From start to finish,

we’ve got your project covered

Contact us
Facebook Youtube

Company

Company Profile

News

Careers

Contact us

Contact us

t: +30 22210 55057
e: sicap@sabo.gr

Miaouli & Tomara - Chalcis, 341 00 Evia, Greece

Registration number 141248722000

  • Cookies Policy
  • Privacy Policy
  • Ελληνικά
  • English
Design & Development by DigitalUp