Pier Extension of the Port of Leipsoi
Scope: Construction of a new 310-meter absorptive quay wall, equipped with modern infrastructure for water supply, power distribution, and fire safety.
Budget: 1.140.000 €
Location: Leipsoi
Scope:
Extension of the existing port infrastructure (68.85 m) to reinforce quay protection and improve mooring capabilities.
The shelter now offers all essential infrastructure for both private and commercial vessels.
Budget: €2.056.451,61 (VAT exempt)
Contracting Authority: South Aegean Region
Location: Patmos
Scope:
Expansion and widening of the North Quay, including an absorptive quay wall and stern ramp for passenger/vehicle vessels.
Technical challenges included:
Solution: Geotechnical reinforcement using gravel piles at 4 different levels.
Budget: 6.900.000 €
Contracting Authority: Samos Region
Location: Fournoi Korseon
Scope: Expansion and modernization of the existing port, enhancing capacity and overall functionality.
Key works include:
Budget: 6.640.000 €
Contracting Authority: Kefalonia Region
Location: Ithaca
Scope:
Full upgrade of marine and land infrastructure.
Including:
Budget: 3.400.000 €
Contracting Authority: D.L.Y.
Location: Regional Unit of Arta
Restoration following the extreme weather event of 26.02.2018
Project 1 – Fishing Shelter of Chorefto
Budget: 7.900.000 €
Contracting Authority: D.L.Y.
Location: Magnesia
Restoration following the extreme weather event of 26.02.2018
Project 2 – Ai Giannis Fishing Shelter & Agioi Saranta Waterfront
Budget: 1.300.000 €
Contracting Authority: D.L.Y.
Location: Magnesia
Scope: Completion of the North Port Basin and construction of new quay walls on the western and southern sides (total length: 450 m)
Goal: Enhance access and service capacity for vessels.
Budget: 8.979.000 €
Contracting Authority: Evia Region
Location: Municipality of Kymi – Aliveri
Scope: The project involves the rehabilitation and reconstruction of the pavement on the existing windward breakwater, its extension with an internal quay wall, as well as dredging of the port basin and execution of electromechanical (E/M) works.
Goal: Expansion and widening of the North Quay, including an absorptive quay wall and stern ramp for passenger/vehicle vessels.
Budget: 3.300.000 €
Contracting Authority: Evia Region
Location: Municipality of Karystos
(Sub-project 1: Akrogiali / Sub-project 2: Surrounding areas outside Mantineia and Akrogiali)
Scope:
The project includes the construction of groynes made of natural stone and boulders, wave breakers, beach nourishment using sediment, and additional coastal armoring structures.
Goal: To mitigate coastal erosion, protect the seafront infrastructure, and enhance the natural shoreline of the region.
Budget: 9.770.000 €
Contracting Authority: Regional Unit of Messinia
Location: Municipality of Avia & Mantineia – R.U. of Messinia
t: +30 22210 55057
e: sicap@sabo.gr
Miaouli & Tomara - Chalcis, 341 00 Evia, Greece
Registration number 141248722000