loader image

Delivery of three Flood Protection projects in North Evia

Our highly skilled engineers undertook adjustment works of the stream banks in the catchment areas of ISTIAIA IV, II & I.

These projects concern the construction of 84 damns 81 pre-damns, including:

  • Retention of the loose materials and control of flood flow to avoid damage.
  • Securing mountain slopes by protecting woodlands and properties after the devastating effects that arose from fire in previous years.

Project challenge? The rough and difficult approach!
Faced with technical difficulties caused by extensive damage and soil erosion, we are committed to delivering them on schedule.

Our mission: To maximize flood protection in the affected areas and protect the local community, culture, and infrastructure works near the burnt lands!