Νew GIS 33/150kV Central Elevation Substation in Evangelismos, Karystos

The SICAP CONSTRUCTIONS took over the construction of Central Lifting Substation GIS 33/150Kv in Evangelismos of the Municipality of Karystos from TERNA ENERGY Α.Β.Ε.Τ.Ε.

The object of the project includes the construction of the building infrastructure of the Substation with a total area of 660 m² with a total budget of € 1,100,000.

SICAP having undertaken projects of high demands is going to complete the project:

  • taking into consideration the particular architectural structure of the area,
  • arranging the installation in an area of 8 to 12 acres and
  • following the highest safety standards.

Our company undertakes projects starting from the initial design, construction and final installation. SICAP’s personnel is qualified with the know-how and the necessary technical equipment to perform even the most demanding project.